Landis+Gyr E230 Three Phase kWh Meter (replaces AMPY 5219)

[DISCONTINUED] Latest L+G direct connect Three Phase meter capable of metering 125A with no CTs. Replaces the AMPY 5219 meter. Display is programmable.

Availability:

Out of stock

Compare

The E230 3 Phase meters record active and reactive energy consumption primarily in three-phase four-wire networks. The meter can operate on one phase (any phase and neutral), two phases (any two phases and neutral), three phases with or without neutral and three phases delta configuration (F-Circuit).

Based on 0 reviews

0.0 overall
0
0
0
0
0

Be the first to review “Landis+Gyr E230 Three Phase kWh Meter (replaces AMPY 5219)”

There are no reviews yet.